Skip to Main Content
City Government
Departments
Doing Business
Our Community
How Do I
Home
Departments
Engineering Division
Documents
Plans & Studies
Plans & Studies
Airport Overland Corridor Study & Amendment
| 2020
39th Street Alternative Study
| 2020
SH-45 Realignment Benefit-Cost Study
| 2020
Bike & Pedestrian Master Plan
| 2019
Transportation Master Plan
| 2019
Nampa CIP by Year
**
Nampa CIP
**
Franklin - Karcher Roundabout Concept Memo
| 2017
12th Avenue Safety & Access Study
| 2016
SH-45 Realignment Concept
| 2014
Concept Section 1
Concept Section 2 | Reduced Alternate Solutions & Costs
Concept Section 3 | Existing & Future Traffic Deficiencies
Concept Section 3 | Roundabout Analysis Technical Memo
Concept Section 4 | Safety Evaluation & 2658
Concept Section 5 | Appendix C & EDR Report
Concept Section 5 | Environmental Scan
Concept Section 6 | Final Phase IA
Concept Section 7 | Stormwater Drainage Memo
Concept Section 8 | Additional Design Elements
Impact Graphi
c
RPZ
(Runway Protection Zone)
Shift Analysis Text Only
| 2012
RPZ
(Runway Protection Zone)
Shift Analysis
| 2012
Airport Overland Corridor Plan
| 2011
Downtown Traffic Alternative Analysis - Final Report
| 2010
Demographics Forecast & Land Use Analysis
| 2008
Citywide GPS Control Network
| 2002 & 2006
**
PLEASE NOTE
: These files will require users to have access to Google Earth. Residents who need additional assistance can find step-by-step instructions
here
.
Nampa Transportation Master Plan
Estimated Transportation Improvements
Arrow Left
Arrow Right
[]
Slideshow Left Arrow
Slideshow Right Arrow